ICS was involved in design, supply and installing 40 plus new and modified conveyors in a room extension at our Hamilton plant. With regular project meetings leading up to the installation everything they supplied fulfilled all production requirements. The job was installed without any issues on time and within budget. All of the new equipment ran 100% on the first production day reaching tally and has not slowed down since. I have no hesitation in recommending ICS to anyone for a quality system installation along with excellent communication at all levels.
We have a team of highly experienced design engineers who are available to assist you with your new project. Contact us to arrange a no-obligation consultation.
Well experienced in assessing the processes used in your factory and designing a solution to improve efficiency, quality and safety. Many of our customers have reported business growth, happier staff and happier customers after our conveyors systems have been put to use in their businesses.
PROJECT BRIEF
A new conveyor was required to transfer product from a wrapper to a metal detector, to replace an existing chute after both machines were repositioned.
DESIGN FEATURES
Due to the relatively small foot print a dia 170mm wheel bend is used. A 20 deg vertical is used to create the incline. Both wheelbend and vertical bend are standard components in the FC103 range
PRODUCTS USED